CACAR supports made-to-order kitchen cabinetry for Malaysian apartments, condominiums, landed homes, renovations and project requirements. Wet and dry kitchen functions, room conditions, appliance information and specification choices should be reviewed for each project.
Wet and dry kitchen zones may have different cooking, cleaning, ventilation, storage and maintenance requirements. The project should identify sink and appliance locations, exposed edges, service openings, countertop joints and local site conditions before materials are confirmed.
Sink locations, appliance positions, ventilation, service openings, exposed edges and countertop joints should be reviewed according to the actual project conditions.
Storage needs, circulation, appliance information and material selections should be coordinated with the intended use of the space.
One-wall, galley, L-shaped, U-shaped and island arrangements may be reviewed according to dimensions, circulation, appliance positions and storage needs. Cabinet quantities and configurations should be recorded in drawings and schedules.
Panels, door finishes, edge treatments, countertops and selected components should be specified separately. Descriptions such as moisture-resistant apply only within the documented scope and do not mean cabinets are unaffected by leaks, standing water, heat, condensation or incorrect installation.
Review panel and substrate options for project specification.
Explore materialsReview available finish categories according to project requirements.
Explore finishesReview countertop materials and project-specific selection considerations.
Explore countertopsReview opening systems, hinges, drawer systems and selected accessories.
Explore hardwareHinges, drawer slides, pull-outs, organisers, handles and other accessories can be selected by project. Optional brands, models, quantities and applications must be listed in the quotation or approved material schedule.
Project coordination can cover drawings, material confirmation, revision approval, manufacturing, inspection and packing requirements. Current factory information is maintained on CACAR’s manufacturing capability page . Shipping terms, importer duties and installation responsibilities must be confirmed separately.
Provide plans or dimensions, wet/dry kitchen scope, appliance information, material and hardware preferences, quantities and delivery destination.
Yes. Components and finishes can be reviewed separately according to the intended use, location and documented project requirements.
No. Material descriptions apply within the documented specification and do not protect against every leak, standing-water, site-cutting or installation condition.
Yes. The applicable drawings, appliance information, material codes and hardware schedule should be approved before production release.
The quotation and agreed Incoterm should identify shipping scope and importer responsibilities. Local delivery and installation are not assumed unless expressly included.
Share your available plans, dimensions, appliance information, material preferences and project requirements for quotation review.
Request a Project Quotation