Contact Us

Factory-Direct Cabinetry, Built for Global Projects

Global Capability,
Project-Focused Support

Whether you are sourcing for residential cabinetry, whole-house furniture, hospitality, development, or repeat-unit projects, CACAR combines manufacturing, project coordination, and specification review to support quotation, design development, production preparation, and delivery planning.

Approx. 130,000 SQM Building Area
Cabinetry & Whole-House Furniture Review
11 Production Lines
Material, Drawing & Specification Coordination
Founded in 1994
Residential, Hospitality & Commercial Projects
Serving 160+ Countries and Regions
Project Review from Inquiry to Production Preparation

Quotation and timing note: Response time, quotation preparation, drawing development, revision scope, production scheduling, and delivery arrangements depend on the completeness and complexity of the submitted project information and confirmed project conditions.

Contact Us

What to Include in Your Inquiry

To help the team review your project more accurately, include as much of the following information as is currently available:

Product scope: Kitchen cabinets, wardrobes, bathroom vanities, TV cabinets, entrance cabinets, wall panels, doors, or other whole-house furniture.

Project type: Apartment, villa, hotel, office, showroom, development, renovation, or other project.

Drawings and dimensions: Floor plans, elevations, wall dimensions, ceiling heights, service positions, or other available measurements.

Appliance information: Refrigerator, oven, dishwasher, rangehood, cooktop, sink, washing machine, or other appliance models where relevant.

Style references: Inspiration images, interior-design drawings, preferred colours, textures, gloss levels, and general design direction.

Material preferences: Panel type, finish, countertop, glass, metal, stone, hardware, or environmental-document requirements.

Delivery destination: Country, city, postal code, port, and complete delivery address where available.

Site conditions: Doorway, corridor, staircase, elevator, loading, unloading, storage, and installation-access information.

Project schedule: Required delivery period, construction programme, approval deadline, or installation target.

Commercial requirements: Approximate quantity, budget range, Incoterm preference, packaging requirement, branding, or repeated-module requirements.

It is acceptable to submit an initial inquiry before every detail is available. Missing information, assumptions, exclusions, and provisional items should be identified during the review process.

What Happens After You Contact Us

01
Initial review

The project coordination team reviews the submitted information and identifies any drawings, dimensions, appliance details, material references, or commercial information still required.

02
Scope clarification

The product scope, room requirements, destination, quantities, materials, hardware, packaging, shipping terms, and installation responsibilities are discussed.

03
Preliminary quotation or budget review

Where sufficient information is available, an initial quotation or budget reference may be prepared. Provisional information should be clearly identified.

04
Design development

Drawings or visual references may be prepared according to the agreed project scope, available information, commercial conditions, and design service arrangement.

05
Revision and approval

The revision scope and approval process should follow the agreed project conditions. Final production documents should record the approved revision number, approval date, material selections, hardware, dimensions, appliance information, and change record.

06
Production preparation

Production begins after the agreed drawings, material specifications, commercial terms, payment conditions, and other production-start requirements have been confirmed.

07
Manufacturing and inspection

Production timing and inspection scope depend on the product type, quantity, materials, finishes, hardware availability, production requirements, and agreed quality checks.

08
Packaging and shipping preparation

Packaging, labels, documents, Incoterms, customs responsibilities, shipping route, and delivery arrangements are confirmed according to the project.

09
Installation preparation

Site readiness, unloading, storage, local installer responsibilities, fixing conditions, appliance coordination, and installation references should be confirmed before delivery.

Important Timing Definitions

Different project stages should not be combined into a single lead-time promise.

Response time:

Time required to review the inquiry and request any missing information.

Design time:

Time required to prepare and revise drawings after sufficient project information has been received.

Production lead-time start condition:

The agreed point at which production timing begins, such as approved drawings, confirmed materials, commercial confirmation, and agreed payment conditions.

Production lead time:

Time required for manufacturing and agreed inspections after the production-start conditions are complete.

Ready-to-ship time:

The point at which production, inspection, packaging, and shipping preparation have been completed.

Shipping time:

International transit time after cargo departure.

Delivery date:

Final arrival timing after customs procedures, port release, local delivery, unloading, and other destination-side arrangements.

Estimated timing should be recorded separately for each applicable stage in the quotation, production plan, shipping plan, or final contract.

Manufacturing Snapshot and Project Review

Dongguan Guangdong, China
≈130,000 SQM Building Area
11 Production Lines
1994 Founded
160+ Countries & Regions

CACAR is based in Dongguan, Guangdong, China, with an approximately 130,000 sqm building area and 11 production lines supporting cabinetry and related custom furniture manufacturing.

Founded in 1994, CACAR has experience supplying customers in more than 160 countries and regions.

Manufacturing capacity, material specifications, hardware, supporting documents, drawings, packaging, delivery and after-sales requirements are reviewed according to the individual project.

Frequently Asked Questions Before You Contact Us

MOQ varies according to the product type, material, finish, hardware, packaging, production method, and order configuration.

A single fixed MOQ does not apply to every international project. The applicable quantity condition should be confirmed after the product scope and specifications have been reviewed.

There is no single total duration that applies to every project.

The overall schedule depends on the completeness of the measurements and drawings, design complexity, revision and approval time, material availability, production requirements, inspection scope, packaging method, shipping route, customs procedures, local delivery, site readiness, and installer availability.

Design, production, ready-to-ship preparation, international transit, customs clearance, local delivery, and installation should be estimated separately.

An initial budget reference may be possible when enough information is available, such as the product type, approximate dimensions, quantity, material level, hardware requirements, destination, and general project scope.

The initial figure may contain assumptions or provisional items. A final quotation requires confirmed dimensions, product scope, materials, hardware, accessories, packaging, shipping terms, and other agreed project conditions.

Design support depends on the project scope, available drawings, commercial conditions, required output, revision requirements, and agreed design service arrangement.

Any free or chargeable design service, drawing scope, number of revisions, deliverables, and applicable conditions should be confirmed before design work begins.

The revision scope should be agreed according to the project complexity, design stage, commercial terms, approval process, and type of change requested.

Changes made after material confirmation, production approval, or manufacturing has started may affect cost, production timing, material availability, and delivery arrangements.

Production should begin only after the agreed production-start conditions have been completed.

These conditions may include approved drawings, confirmed revision number, material and hardware selections, appliance information, commercial confirmation, payment conditions, sample approval, and other requirements stated in the quotation or contract.

You can begin with the information currently available, such as floor plans, dimensions, room requirements, appliance references, inspiration images, material preferences, delivery destination, and intended schedule.

The project coordination team will identify additional information required before quotation, design approval, production, shipping, or installation preparation.

Ready to discuss your project? Use the contact form on this page to submit your drawings, dimensions, product requirements, material preferences, destination, and project schedule for review.

Go to Contact Form

CONTACT US

If you have any queries, get in touch today! Don't hesitate. We try to take the extra step for our customer satisfaction.
FirstName *
LastName *
Email *
Message *
Contact CACAR
FirstName *
LastName *
Email *
Message *